header

Yêu cầu báo giá

Thứ ba - 02/03/2021 06:50

Preliminary Investigation Page1

Preliminary Investigation Page1

Preliminary Investigation

Company Info.

Company Name

Name

E-mail

Tel No.

Fax No.

Address

Aboveground Storage Tank Venting Device

Device Selection
 Breather Valve
 Flame Arrester
 Breather Valve with Flame Arrester
 Emergency Cover
 Free Vent Cover
 Rupture Discs & Others
Installation
 End-Line
 In-Line
 Steam Jacket or others
Purpose of Flame Arrester
 Deflagration
 Longburning Proof
 Detonation Proofs

Design Data for Vent Sizing

Tag No.

Tank No.

Tank Type

Setting Press/Vac. (mmWC)

Diameter (m)

Flash Point (Celsius)

Height/Length (m)

Filling Rate (M 3 /hr)

Tank Capacity (m 3 )

Draw-Out Rate (M 3 /hr)

Operating Pressure (mmWC)

Insulation Thick (In.)

Max.Allowable Press. (mmWC)

Heating Coil Heat (Btu/Lb)

Max.Allowable Vac. (mmWC)

Inert Gas (SCFH)

Design Pressure (mmWC)

Operating Temp. (℃)


SUBMIT

Preliminary Investigation Page1

Preliminary Investigation Page2
Thank you for reading the news of Kspc.com.vn

Tổng số điểm của bài viết là: 0 trong 0 đánh giá

Click để đánh giá bài viết

  Ý kiến bạn đọc

Những tin mới hơn

Những tin cũ hơn

Bạn đã không sử dụng Site, Bấm vào đây để duy trì trạng thái đăng nhập. Thời gian chờ: 60 giây